HX
On time
62.2%
Arrived on time or early
Within 5 minutes
91%
On time or up to 4 minutes late
Within 15 minutes
98.5%
On time or up to 14 minutes late
Cancelled
2.4%
Eligible services cancelled
Average delay
4.2 min
Mean delay among late arrivals
Services analysed
4,176
Eligible services in this report
Timed services4,052
Timing coverage99.4%
Completed days28
Generated24 Nov 2026, 19:11
Performance over time
Daily destination punctuality
How arrival performance changed across the reporting period.
Delay profile
How late were completed trains?
Completed services grouped by final arrival delay.
Through the day
Reliability by departure hour
Final arrival performance grouped by scheduled origin departure hour.
Weekly pattern
Performance by weekday
Mutually exclusive arrival groups for each weekday.
Routes
Most affected routes
Lowest within-five-minute arrival performance; at least 20 timed services required.
| Route | Services | Within 5 min | Cancelled |
|---|---|---|---|
| Heathrow Terminal 5to London Paddington | 2,088 | 89.4% | 2.5% |
| London Paddingtonto Heathrow Terminal 5 | 2,085 | 92.7% | 2.4% |
Destinations
Most affected destination stations
Lowest within-five-minute performance at final destinations.
| Station | Services | Within 5 min |
|---|---|---|
| London PaddingtonPAD | 2,091 | 89.3% |
| Heathrow Terminal 5HWV | 2,085 | 92.7% |
Data disclaimer: Punctuality is based on final-destination arrivals, not every intermediate stop. These figures use data received and collected by MapRail, which may be incomplete or inaccurate, and should not be relied upon.