All operators

Greater Anglia

Performance from 27 October 2026 to 23 November 2026.

LE
On time
69.3%
Arrived on time or early
Within 5 minutes
92.2%
On time or up to 4 minutes late
Within 15 minutes
98.8%
On time or up to 14 minutes late
Cancelled
1.2%
Eligible services cancelled
Average delay
4.1 min
Mean delay among late arrivals
Services analysed
34,064
Eligible services in this report
Timed services33,444
Timing coverage99.4%
Completed days28
Generated24 Nov 2026, 19:11

Performance over time

Daily destination punctuality

How arrival performance changed across the reporting period.

Delay profile

How late were completed trains?

Completed services grouped by final arrival delay.

Through the day

Reliability by departure hour

Final arrival performance grouped by scheduled origin departure hour.

Weekly pattern

Performance by weekday

Mutually exclusive arrival groups for each weekday.

Routes

Most affected routes

Lowest within-five-minute arrival performance; at least 20 timed services required.

RouteServicesWithin 5 minCancelled
London Liverpool Streetto Southminster4050.0%0.0%
Cambridgeto Norwich14359.9%0.7%
Ipswichto Peterborough17461.8%2.3%
Peterboroughto Colchester7063.8%0.0%
Peterboroughto Ipswich12967.4%0.0%
Colchesterto Peterborough2568.0%0.0%
Stansted Airportto Norwich28768.5%1.7%
Southminsterto London Liverpool Street10272.5%1.0%
Braintreeto Shenfield2075.0%0.0%
Wickfordto Southminster64275.6%0.2%
London Liverpool Streetto Southend Victoria1,54376.9%0.2%
Elyto Norwich5380.8%0.0%

Destinations

Most affected destination stations

Lowest within-five-minute performance at final destinations.

StationServicesWithin 5 min
PeterboroughPBO19962.6%
SouthminsterSMN68374.1%
Southend VictoriaSOV1,54677.0%
ShenfieldSNF3479.4%
WickfordWIC57286.3%
Harwich InternationalHPQ11187.4%
Bury St EdmundsBSE2487.5%
Oulton Broad SouthOUS6188.7%
CambridgeCBG98589.1%
ElyELY18789.9%
NorwichNRW2,84890.2%
London Liverpool StreetLST8,66990.8%

Data disclaimer: Punctuality is based on final-destination arrivals, not every intermediate stop. These figures use data received and collected by MapRail, which may be incomplete or inaccurate, and should not be relied upon.