Service timetable
21:35 London Gateway GB Railfreight to Doncaster Iport GB Railfreight
Tuesday 6 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway GB Railfreight | 21:35 | 21:26 | -9 min | |||
| London Gateway Dep Line | 21:38 | 21:40 | 21:29 | 21:40 | On time | |
| Thames Haven Sig Ur882 | 21:47 | 21:47 | 21:38 | 21:47 | On time | |
| Lea Junction | 22:36 | 22:49 | 22:40 | 22:50 | +1 min | |
| Finsbury Park | 8 | 23:03½ | 23:05½ | 23:07 | 23:08 | +3 min |
| Peterborough | 4 | 00:49½ | 00:50½ | 00:55 | 00:59 | +9 min |
| Doncaster Dn Decoy Rec5/Br | 02:46 | 03:06 | 02:48 | 03:08 | +2 min | |
| Doncaster Iport GB Railfreight | 03:13 | 03:25 | +12 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.