Service timetable
21:59 Liverpool Biomass Terminal Gbf to Drax Aes (GB Railfreight)
Tuesday 6 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2400
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Liverpool Biomass Terminal Gbf | 21:59 | 21:59 | On time | |||
| Strand Road Level Crossing | 22:09 | 22:11 | 22:09 | 22:11 | On time | |
| Edge Lane Junction | 22:35 | 22:37 | 22:36 | 22:38 | +1 min | |
| Tuebrook Sidings GB Railfreight | 22:43 | 23:00 | 22:44 | 23:01 | +1 min | |
| Doncaster | DG | 02:41 | 02:43 | 02:47 | 02:49 | +6 min |
| Sudforth Lane Down (GB Railfreight) | 03:26½ | 03:40 | 03:32½ | 03:46 | ||
| Drax Aes (GB Railfreight) | 04:00 | 04:06 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.