Service timetable
22:00 Tunstead Sidings (Fhh) to Kennett (Fhh)
Tuesday 6 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2400
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Tunstead Sidings (Fhh) | 22:00 | |||||
| Sheffield | 2A | 23:01 | 23:03 | |||
| Doncaster Down Decoy Hhr | 23:42½ | 04:13½ | ||||
| Peterborough | 4 | 06:00½ | 06:02½ | |||
| Ely | UTS | 06:59 | 07:20 | |||
| Kennet Redland Ground Frme | 07:47½ | 07:49½ | ||||
| Kennett (Fhh) | 07:55 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.