Service timetable
22:38 London Gateway Frghtliner to Coatbridge F.l.t.
Wednesday 7 October 2026
Cancelled This service has been reported as cancelled.
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Frghtliner | 22:38 | |||||
| London Gateway Dep Line | 22:41 | 22:44½ | ||||
| Thames Haven Sig Ur882 | 22:51½ | 22:51½ | ||||
| Gospel Oak Sig Nl 1306 | 23:55½ | 23:56½ | ||||
| Willesden Up & Down Goods | 2 | 00:20 | 00:35 | |||
| Wembley Receptions 1-7 | 7 | 00:44 | 00:56 | |||
| Rugby | 1 | 02:41 | 02:43 | |||
| Basford Hall Yard (Fl) | 04:28 | 06:05 | ||||
| Carlisle | 3 | 08:31½ | 08:33½ | |||
| Mossend | 10:12½ | 10:14½ | ||||
| Coatbridge D.g.l. | 10:24½ | 10:25½ | ||||
| Coatbridge Flt Shunt Neck | 10:29½ | 10:31½ | ||||
| Coatbridge F.l.t. | 10:38 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.