Service timetable
22:01 Barrow Hill Up Sidings No 2-3 to Tunstead Sidings (Fhh)
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Barrow Hill Up Sidings No 2-3 | 22:01 | |||||
| Sheffield | 6 | 22:31 | 22:34 | |||
| Great Rocks Junction | 23:20 | 23:20 | ||||
| Tunstead Sidings (Fhh) | 23:26 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.