Service timetable
22:54 Tunstead Sidings (Fhh) to Hanwell Bridge Loop
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2400
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Tunstead Sidings (Fhh) | 22:54 | |||||
| Hyde North | 23:46 | 23:49 | ||||
| Heaton Norris Junction | 00:04 | 00:11 | ||||
| Basford Hall Yard (Fl) | 01:03 | 01:05 | ||||
| Rugby | 6 | 03:05 | 03:07 | |||
| Northampton | 1 | 03:36 | 03:51 | |||
| Bletchley Relief 1 | 04:32½ | 04:38½ | ||||
| Wembley Receptions 1-7 | 6 | 05:39 | 07:06 | |||
| Acton Main Line | DGL | 07:22 | 07:32 | |||
| Hanwell Bridge Loop | DGL | 07:45 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.