Service timetable

04:37 Norwich C.pt. T.&R.s.m.d to Norwich

Thursday 8 October 2026

Live map
Headcode: 5S04Headcode5S04 OperatorLE UIDC03918

Planned service information

Power type
Diesel multiple unit
Timing load / planned train type
755
Maximum speed
100 mph
Operating characteristics
D
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Norwich C.pt. T.&R.s.m.d04:37 04:55 +18 min
Norwich604:47 05:08 +21 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.