Detailed timetable
05:15 Brighton Down Siding to Brighton
Thursday 8 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Brighton Down Siding | 1N | 05:15 | 05:13 | -2 min | ||
| Brighton Reception Road | 05:22 | 05:22 | 05:17 | 05:19 | -3 min | |
| Brighton | 4 | 05:25 | 05:21 | -4 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.