Detailed timetable
04:46 Brighton Down Siding to Brighton
Thursday 8 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Brighton Down Siding | 1S | 04:46 | 04:46 | On time | ||
| Brighton Reception Road | 04:53 | 04:53 | 04:50 | 04:52 | -1 min | |
| Brighton | 5 | 04:56 | 04:54 | -2 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.