Service timetable
23:37 Bedford to Three Bridges Tl Up Depot
Thursday 8 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- DQY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bedford | 2 | 23:37 | ||||
| Luton | 4 | 23:53½ | 23:55 | |||
| Farringdon (London) | 3 | 00:36½ | 00:37½ | |||
| London Blackfriars | 1 | 00:40 | 00:40 | |||
| East Croydon | 6 | 01:06 | 01:15½ | |||
| Three Bridges | 3 | 01:40 | 01:44 | |||
| Three Bridges Up Tld Nx | 01:46 | 01:46 | ||||
| Three Bridges Tl Up Depot | 01:50 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.