Service timetable
05:46 Cambridge Sidings North to Cambridge
Thursday 8 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge Sidings North | 05:46 | 05:44 | -2 min | |||
| Cambridge | 8 | 05:53 | 05:49 | -4 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.