Service timetable
19:56 Toton Up Sidings to Acton T.c.
Thursday 8 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2000
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Toton Up Sidings | 19:56 | |||||
| Peterborough | 1 | 22:03½ | 22:08½ | |||
| Conington Loop | 22:27 | 22:40 | ||||
| Acton T.c. | 01:10 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.