Service timetable
23:10 Leeds F.l.t. to London Gateway Frghtliner
Thursday 8 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Leeds F.l.t. | 23:10 | 23:13 | +3 min | |||
| Doncaster | 1 | 00:05 | 00:07 | 00:10 | 00:12 | +5 min |
| Doncaster Sig D254 | 00:12 | 00:32 | 00:17 | 00:37 | ||
| Peterborough | 1 | 02:28 | 02:31½ | 02:03 | 02:10 | -21 min |
| Alexandra Palace | 1 | 04:03½ | 04:05 | 04:01 | 04:02 | -3 min |
| London Gateway Port Lg11 | 05:10 | 05:12 | 05:15 | 05:17 | +5 min | |
| London Gateway Arrival | 05:15 | 05:17 | 05:20 | 05:22 | +5 min | |
| London Gateway Frghtliner | 05:20 | 05:25 | +5 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.