Service timetable
03:00 London Gateway Frghtliner to Southampton M.c.t.
Thursday 8 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Frghtliner | 03:00 | |||||
| London Gateway Dep Line | 03:03 | 03:05½ | ||||
| Thames Haven Sig Ur882 | 03:12½ | 03:12½ | ||||
| Gospel Oak Sig Nl 1306 | 04:20 | 04:23½ | ||||
| Acton Main Line | DGL | 04:45 | 04:48 | |||
| Reading | 13 | 05:33 | 05:35 | |||
| Basingstoke Sig Be547 | 05:59½ | 06:00 | ||||
| Worting Junction | 06:08 | 06:32 | ||||
| Wallers Ash Loop | 06:48½ | 07:44 | ||||
| Eastleigh | 3 | 07:59½ | 08:05 | |||
| Southampton M.c.t. | 08:27 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.