Service timetable
02:41 Tilbury Lct (Flt) to Barry Docks Dow Chemicals
Thursday 8 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Tilbury Lct (Flt) | 02:41 | |||||
| Tilbury R.c.t. | 02:56 | 03:16 | ||||
| Gospel Oak Sig Nl 1306 | 04:19 | 04:23½ | ||||
| Acton Main Line | DGL | 04:45 | 04:48 | |||
| Reading | 13 | 05:35½ | 05:37½ | |||
| Foxhall Junction | 06:04½ | 06:21½ | ||||
| Wentloog (Freightliners) | 08:21½ | 09:11½ | ||||
| Barry Docks Dow Chemicals | 10:12 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.