Service timetable
01:29 Liverpool Emr GB Railfreight to Attercliffe Sidings GB Railfreight
Thursday 8 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 60 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Liverpool Emr GB Railfreight | 01:29 | |||||
| Strand Road Level Crossing | 01:44 | 01:46 | ||||
| Warrington Bank Quay | 2 | 02:36 | 02:39 | |||
| Chinley | 2 | 04:01½ | 04:03½ | |||
| Sheffield Signal S81 | 04:38½ | 04:49 | ||||
| Brightside Receptions 1&2 | 2 | 05:00 | 07:17 | |||
| Attercliffe Sidings GB Railfreight | 07:24 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.