Service timetable
00:44 London Gateway Db Cargo to East Mids Gateway Terminal Dbc
Thursday 8 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Db Cargo | 00:44 | |||||
| London Gateway Dep Line | 00:47 | 00:49 | ||||
| Thames Haven Sig Ur882 | 00:56 | 00:56 | ||||
| Ripple Lane Signal 806 | 01:25½ | 01:33 | ||||
| Finsbury Park | 8 | 02:20½ | 02:22½ | |||
| Peterborough | 4 | 04:00½ | 04:03½ | |||
| Castle Donington Emdc | 05:42 | 06:16 | ||||
| East Mids Gateway Arrival | 06:26 | 06:28 | ||||
| East Mids Gateway Terminal Dbc | 06:38 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.