Service timetable
00:40 Bristol Temple Meads to Bristol Parkway
Friday 9 October 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- 802
- Maximum speed
- 125 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bristol Temple Meads | 12 | 00:40 | 00:22 | -18 min | ||
| Bristol Parkway | 1 | 00:50 | 00:46 | -4 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.