Service timetable
08:50 Cambridge Sidings North to Kings Lynn
Friday 9 October 2026
Cancelled This service has been reported as cancelled.
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 720
- Maximum speed
- 100 mph
- Operating characteristics
- DQ
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge Sidings North | 08:50 | |||||
| Cambridge Sidings South | 08:59 | 09:07 | ||||
| Ely | 1 | 09:27 | 09:28 | |||
| Littleport | 2 | 09:34½ | 09:47 | |||
| Downham Market | 2 | 09:56 | 09:56 | |||
| Watlington | 2 | 10:01½ | 10:01½ | |||
| Kings Lynn | 1 | 10:10 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.