Service timetable
06:28 Welwyn G.c. F.d. to Doncaster D.c.e Sidings
Friday 9 October 2026
Planned service information
- Power type
- Diesel
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Welwyn G.c. F.d. | 06:28 | |||||
| Royston (Herts) Loop | 06:59 | 07:38½ | ||||
| Ely Recp. | 08:20½ | 08:26 | ||||
| Peterborough | GL | 09:04 | 09:32½ | |||
| Lincoln Central | DM | 10:36½ | 10:45 | |||
| Doncaster Sig D249 | 11:34½ | 11:54 | ||||
| Doncaster | DG | 12:02½ | 12:11 | |||
| Doncaster D.c.e Sidings | 12:17 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.