Service timetable
21:14 London Gateway Frghtliner to Coatbridge F.l.t.
Friday 9 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Frghtliner | 21:14 | |||||
| London Gateway Dep Line | 21:17 | 21:19 | ||||
| Thames Haven Sig Ur882 | 21:26 | 21:26 | ||||
| Lea Junction | 22:17½ | 22:19½ | ||||
| Camden Rd. E. Junction | 22:36 | 22:43½ | ||||
| Wembley Receptions 1-7 | 7 | 23:10 | 01:01 | |||
| Northampton South Junction | 02:19 | 02:20 | ||||
| Rugby | 2 | 02:51½ | 02:53½ | |||
| Birmingham International | 3 | 03:22 | 03:24 | |||
| Basford Hall Yard (Fl) | 04:47½ | 05:57 | ||||
| Carlisle | 3 | 08:28 | 08:30 | |||
| Mossend | 10:14½ | 10:16½ | ||||
| Coatbridge D.g.l. | 10:27½ | 10:27½ | ||||
| Coatbridge Flt Shunt Neck | 10:31½ | 10:33½ | ||||
| Coatbridge F.l.t. | 10:40 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.