Service timetable
05:18 Harringay Up Rev Sidings to Royston (Herts) Loop
Friday 9 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 715
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Harringay Up Rev Sidings | 05:18 | |||||
| Hitchin | 2 | 06:11 | 06:11 | |||
| Hitchin East Junction Sig Yb3283 | 06:15 | 06:20 | ||||
| Royston (Herts) Loop | 06:37 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.