Service timetable
00:57 Southampton W Docks (GB Railfreight) to Donnington Rft GB Railfreight
Friday 9 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Southampton W Docks (GB Railfreight) | 00:57 | |||||
| Millbrook Dock Exit | 01:07 | 01:09 | ||||
| Millbrook Sig E941 | 01:12½ | 01:52½ | ||||
| Basingstoke | 4 | 03:24½ | 03:44½ | |||
| Walsall | 2 | 06:42½ | 06:45½ | |||
| Crewe Sig. Il3017/5021 | DSI | 07:51½ | 08:42 | |||
| Donnington Rft GB Railfreight | 10:02 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.