Detailed timetable
02:06 Drax Aes (Flhh) to Hope (Earles Sidings) Fhh
Friday 9 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2400
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Drax Aes (Flhh) | 02:06 | |||||
| Drax Branch Junction | pass | 02:16 | ||||
| Hensall | pass | 02:18½ | ||||
| Whitley Bridge | pass | 02:21½ | ||||
| Sudforth Lane Signal Box | pass | 02:23½ | ||||
| Knottingley East Junction | pass | 02:28 | ||||
| Knottingley South Junction | pass | 02:29½ | ||||
| Haywood Junction | pass | 02:44 | ||||
| Shaftholme Junction | pass | 02:48½ | ||||
| Doncaster | 3B | 02:58½ | 03:00½ | |||
| Hexthorpe Junction | pass | 03:07 | ||||
| Mexborough | pass | 03:14½ | ||||
| Swinton (South Yorks) | pass | 03:16½ | ||||
| Aldwarke Junction | pass | 03:19 | ||||
| Masborough Junction | pass | 03:23 | ||||
| Holmes Junction | pass | 03:24 | ||||
| Wincobank Junction | pass | 03:26½ | ||||
| Nunnery Main Line Junction | pass | 03:34½ | ||||
| Sheffield | 6 | 03:36½ | 03:40½ | |||
| Dore Station Junction | pass | 03:57 | ||||
| Dore West Junction | pass | 03:59 | ||||
| Totley Tunnel East | pass | 04:01 | ||||
| Grindleford | 1 | pass | 04:12 | |||
| Bamford | 1 | pass | 04:16 | |||
| Earles Sidings S.b. | pass | 04:21½ | ||||
| Hope (Earles Sidings) Fhh | 04:24 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.