Service timetable
09:27 Southampton M.c.t. Ews to Northampton Gateway Dbc
Friday 9 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Southampton M.c.t. Ews | 09:27 | |||||
| Southampton Signal E746 | 09:38 | 09:40 | ||||
| Eastleigh | 1 | 09:53½ | 09:55½ | |||
| Wallers Ash Loop | 10:19½ | 10:40 | ||||
| Basingstoke | 4 | 11:00 | 11:01 | |||
| Didcot Parkway | 3 | 11:42 | 11:44 | |||
| Northampton Gateway A&D | 13:07 | 13:07 | ||||
| Northampton Gateway Dbc | 13:08 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.