Detailed timetable

15:50 Barrow-in-Furness to Barrow C.s.

Saturday 10 October 2026

Live map
Headcode: 5T52Headcode5T52 OperatorNorthern UIDC17247

Planned service information

Power type
Diesel multiple unit
Timing load / planned train type
S
Maximum speed
75 mph
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Barrow-in-Furness215:50 15:42 -8 min
Barrow C.s.15:53 15:44 -9 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.