Detailed timetable
06:20 Bristol Parkway to Swindon
Saturday 10 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 802
- Maximum speed
- 125 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bristol Parkway | 4 | 06:20 | 06:33 | +13 min | ||
| Westerleigh Junction | pass | 06:24½ | 06:37 | +13 min | ||
| Hullavington | pass | 06:31 | 06:44 | +13 min | ||
| Wootton Bassett Junction | pass | 06:37½ | 06:50 | +13 min | ||
| Swindon | 3 | 06:44 | 06:55 | +11 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.