Detailed timetable

23:38 Truro to Penzance T.& R.s.m.d.

Saturday 10 October 2026

Live map
Headcode: 5T94Headcode5T94 OperatorGreat Western Railway UIDC49896

Planned service information

Power type
Diesel multiple unit
Timing load / planned train type
S
Maximum speed
75 mph
Operating characteristics
D
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Truro123:38 23:35 -3 min
Penwithers Junctionpass23:39½ 23:37 -2 min
Chacewater Signal R31pass23:45½ 23:42 -3 min
Redruth Sig R27pass23:49 23:46
Camborne1pass23:53½ 23:50 -3 min
Hayle Signal R19pass23:58½ 23:55½
St Erth1pass00:01 23:58 -3 min
Long Rockpass00:05½ 00:02½
Penzance300:0900:15 00:05 00:15 On time
Penzance T.& R.s.m.d.00:25 00:22 -3 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.