Service timetable
03:52 Drax Aes (GB Railfreight) to Liverpool Biomass Terminal Gbf
Saturday 10 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 800
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Drax Aes (GB Railfreight) | 03:52 | |||||
| Doncaster | 3B | 04:33 | 04:36 | |||
| Swinton (South Yorks) | 05:00 | 05:10½ | ||||
| Sheffield | 6 | 05:26½ | 05:36 | |||
| Hartford Junction | 07:20 | 07:28 | ||||
| Edge Lane Junction | 08:08 | 08:10 | ||||
| Bootle Junction Stop Board | 08:27 | 08:29 | ||||
| Strand Road Level Crossing | 08:34 | 08:36 | ||||
| Liverpool Biomass Terminal Gbf | 08:46 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.