Service timetable
05:21 Masborough N&W GB Railfreight to London Gateway GB Railfreight
Saturday 10 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1235
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Masborough N&W GB Railfreight | 05:21 | |||||
| Masbro S.s. Junction | 05:31 | 05:33 | ||||
| Decoy Nth Junction | 06:02½ | 06:04½ | ||||
| Peterborough North Yard GB Railfreight | 08:05 | 09:04½ | ||||
| Spital South Junction P458 | 09:08 | 09:21 | ||||
| Peterborough | 1 | 09:23 | 09:26 | |||
| Conington Loop | 09:43½ | 09:46 | ||||
| Finsbury Park | 2 | 11:26 | 11:28 | |||
| Stratford Signal L295 | 11:43½ | 11:46½ | ||||
| London Gateway Port Lg11 | 12:32 | 12:34 | ||||
| London Gateway Arrival | 12:37 | 12:39 | ||||
| London Gateway GB Railfreight | 12:42 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.