Detailed timetable
21:56 Abington Down Siding to Abington
Saturday 10 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 715
- Maximum speed
- 60 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Abington Down Siding | 21:56 | 21:56 | On time | |||
| Abington | DPL | pass | 21:59½ | 21:59½ | ||
| Carstairs South Junction | pass | 22:14½ | 22:14½ | |||
| Carstairs | 2 | 22:17 | 22:27 | 22:17 | 22:27 | |
| Carstairs South Junction | pass | 22:28 | 22:28 | |||
| Abington | UM | 22:45 | 22:45 | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.