Detailed timetable
16:22 Warminster to Warminster
Saturday 10 October 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- E
- Maximum speed
- 90 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Warminster | 2 | 16:22 | ||||
| Warminster Signal W753 | 16:23 | 16:27 | ||||
| Warminster | 1 | 16:28 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.