Detailed timetable

08:49 Worcester L.m.d. to Worcester Shrub Hill

Sunday 11 October 2026

Live map
Headcode: 5V19Headcode5V19 OperatorWest Midlands Railway UIDW00458

Planned service information

Power type
Diesel multiple unit
Timing load / planned train type
69
Maximum speed
100 mph
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Worcester L.m.d.08:49 08:49 On time
Worcester Shrub Hill1B08:52 08:52

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.