Service timetable
04:33 Southampton M.c.t. to Barry Docks Dow Chemicals
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Southampton M.c.t. | 04:33 | |||||
| Eastleigh | 1 | 04:54½ | 04:57 | |||
| Wentloog (Freightliners) | 08:21½ | 09:11½ | ||||
| Barry Docks Dow Chemicals | 10:12 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.