Service timetable
03:19 Drax Aes (GB Railfreight) to Liverpool Biomass Terminal Gbf
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 800
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Drax Aes (GB Railfreight) | 03:19 | |||||
| Wakefield Kirkgate | 3 | 04:03 | 04:05½ | |||
| Edge Lane Junction | 06:08 | 06:11 | ||||
| Bootle Junction Stop Board | 06:29½ | 06:31½ | ||||
| Strand Road Level Crossing | 06:36 | 06:38 | ||||
| Liverpool Biomass Terminal Gbf | 06:48 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.