Detailed timetable
03:28 Drax Aes (Flhh) to Hope (Earles Sidings) Fhh
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2400
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Drax Aes (Flhh) | 03:28 | |||||
| Drax Branch Junction | pass | 03:38½ | ||||
| Hensall | pass | 03:41 | ||||
| Whitley Bridge | pass | 03:44 | ||||
| Sudforth Lane Signal Box | pass | 03:46 | ||||
| Knottingley East Junction | pass | 03:50½ | ||||
| Knottingley South Junction | pass | 03:53½ | ||||
| Haywood Junction | pass | 04:08 | ||||
| Shaftholme Junction | pass | 04:10½ | ||||
| Doncaster | DG | 04:22½ | 04:39½ | |||
| Hexthorpe Junction | pass | 04:47½ | ||||
| Mexborough | pass | 04:55 | ||||
| Swinton (South Yorks) | pass | 04:57 | ||||
| Aldwarke Junction | pass | 04:59½ | ||||
| Masborough Junction | pass | 05:03½ | ||||
| Holmes Junction | pass | 05:05 | ||||
| Wincobank Junction | pass | 05:07½ | ||||
| Nunnery Main Line Junction | pass | 05:17 | ||||
| Sheffield | 6 | pass | 05:19 | |||
| Heeley Up Loop | 05:28 | 05:43 | ||||
| Dore Station Junction | pass | 05:50 | ||||
| Dore West Junction | pass | 05:52 | ||||
| Totley Tunnel East | pass | 05:54½ | ||||
| Grindleford | 1 | pass | 06:05½ | |||
| Bamford | 1 | pass | 06:09½ | |||
| Earles Sidings S.b. | pass | 06:15 | ||||
| Hope (Earles Sidings) Fhh | 06:17 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.