Service timetable
00:31 Cambridge to Cambridge Sidings North
Monday 12 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 720
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge | 1 | 00:31 | 00:25 | -6 min | ||
| Cambridge Sidings North | 00:39 | 00:31 | -8 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.