Service timetable
06:02 Colchester Up Passngr Loop to Ipswich
Monday 12 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 755
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Colchester Up Passngr Loop | 06:02 | |||||
| Colchester | 3 | 06:04 | 06:07 | 06:03 | 06:06 | -1 min |
| Ipswich | 4B | 06:29 | 06:27 | -2 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.