Service timetable
14:21 Colchester C.s.d. to Norwich C.pt. T.&R.s.m.d
Monday 12 October 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- 755
- Maximum speed
- 100 mph
- Operating characteristics
- DQ
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Colchester C.s.d. | 14:21 | |||||
| Colchester | 2 | 14:26 | 14:27 | |||
| Ipswich | 3 | 14:43 | 14:44 | |||
| Norwich Royal Dock | 15:22 | 15:33 | ||||
| Norwich C.pt. T.&R.s.m.d | 15:44 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.