Detailed timetable
04:55 Cambridge Reception Sidings to Cambridge
Tuesday 13 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge Reception Sidings | 04:55 | 05:00 | +5 min | |||
| Mill Road Junction | pass | 04:58 | 05:02 | +4 min | ||
| Coldham Lane Dg Loop | 05:00 | 05:13 | No report | |||
| Cambridge | 7 | 05:16 | 05:16 | On time | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.