Service timetable
00:51 Upminster Tamper Siding to Benfleet
Tuesday 13 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 715
- Maximum speed
- 60 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Upminster Tamper Siding | 00:51 | |||||
| Upminster | 1A | 00:51½ | 00:55 | |||
| Upminster Signal Ur852 | 00:57 | 01:00 | ||||
| Upminster | 2 | 01:02 | 01:05 | |||
| Laindon | 3 | 01:19 | 01:32 | |||
| Benfleet | 2 | 01:45 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.