Service timetable
22:20 Phillips Loop to Doncaster Down Decoy GB Railfreight
Wednesday 14 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 60 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Phillips Loop | 22:20 | |||||
| Belasis Lane S.b. | 22:33 | 22:35 | ||||
| Skelton Bridge Junction | 23:45 | 00:05 | ||||
| Doncaster | DG | 00:50½ | 00:52½ | |||
| Doncaster Down Decoy GB Railfreight | 01:04 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.