Detailed timetable
05:40 Thirsk to Darlington Down Sidings
Wednesday 14 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 715
- Maximum speed
- 60 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Thirsk | 2 | 05:40 | 05:40 | On time | ||
| Longlands Junction | pass | 05:52 | 05:52 | |||
| Northallerton | pass | 05:53 | 05:53 | |||
| Darlington Sth Dn Pass Lp | 06:08 | 06:33 | 06:08 | 06:33 | ||
| Darlington | 4BX | 06:36 | 06:41 | 06:36 | 06:41 | |
| Darlington Down Sidings | 06:43 | 06:43 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.