Service timetable

15:40 London Gateway Frghtliner to Widnes Freight Terminal Fl

Friday 20 November 2026

Live map
Headcode: 4M58Headcode4M58 UIDH37826

Planned service information

Power type
Diesel
Timing load / planned train type
1600
Maximum speed
75 mph
Operating characteristics
Y
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
London Gateway Frghtliner15:40 15:27 -13 min
London Gateway Dep Line15:4315:45 No report
Thames Haven Sig Ur88215:5216:17 No report
Ripple Road Junction17:02½18:27½ 16:56½ 18:39 +12 min
Gospel Oak Sig Nl 130619:03½19:09 19:05½ 19:09 On time
Harlesden Junction19:2919:48½ 19:36 19:44 -4 min
Willesden Up & Down ReliefDRL19:5820:19 No report
Northampton South Junction21:4121:44 No report
Crewe Sig. Il3017/5021DSI23:4223:52½ 23:40 23:45 -7 min
Acton Bridge00:2000:26 00:23 00:29 +3 min
Ditton Reception Sidings00:4400:48½ No report
Widnes Freight Terminal Fl00:54 01:15 +21 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.