Detailed timetable
06:15 Swansea Maliphant Iep Dpt to Carmarthen
Saturday 21 November 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- 802
- Maximum speed
- 125 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Swansea Maliphant Iep Dpt | 06:15 | 06:08 | -7 min | |||
| Swansea | 4 | 06:19 | 06:34½ | 06:12 | 06:35 | +1 min |
| Swansea Loop East | pass | 06:36 | 06:37 | +1 min | ||
| Swansea Loop West | pass | 06:38 | 06:39 | +1 min | ||
| Gowerton | pass | 06:44½ | No report | |||
| Llandeilo Junction | pass | 06:48 | 06:48 | On time | ||
| Llanelli | DPL | pass | 06:49½ | 06:49 | On time | |
| Pembrey & Burry Port | pass | 06:53 | No report | |||
| Kidwelly | 2 | pass | 06:57½ | 06:57 | On time | |
| Bertwyn Level Crossing | pass | 06:59 | 06:59 | On time | ||
| Ferryside | pass | 07:01½ | No report | |||
| Carmarthen Junction | pass | 07:10½ | 07:10 | On time | ||
| Carmarthen | 1 | 07:12 | 07:12 | On time | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.