Service timetable

20:37 Great Malvern to Great Malvern

Saturday 21 November 2026

Live map
Headcode: 5T55Headcode5T55 OperatorGreat Western Railway UIDC42954

Planned service information

Power type
Diesel multiple unit
Timing load / planned train type
E
Maximum speed
90 mph
Operating characteristics
D
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Great Malvern20:37 20:37 On time
Malvern Wells Loop20:4021:11 20:40 21:11
Malvern Wells21:1321:20 21:13 21:20
Great Malvern21:22 21:22

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.