Service timetable
01:50 Drax Aes (GB Railfreight) to Liverpool Biomass Terminal Gbf
Saturday 21 November 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 800
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Drax Aes (GB Railfreight) | 01:50 | |||||
| Doncaster | 3B | 02:35½ | 02:37½ | |||
| Edge Lane Junction | 04:58 | 05:04 | ||||
| Bootle Junction Stop Board | 05:21 | 05:23 | ||||
| Strand Road Level Crossing | 05:28 | 05:30 | ||||
| Liverpool Biomass Terminal Gbf | 05:40 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.