Service timetable
10:37 London Gateway Frghtliner to Southampton M.c.t.
Saturday 21 November 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Frghtliner | 10:37 | |||||
| London Gateway Dep Line | 10:40 | 10:42½ | ||||
| Thames Haven Sig Ur882 | 10:49½ | 10:49½ | ||||
| Gospel Oak Sig Nl 1306 | 11:45 | 11:48½ | ||||
| Acton Main Line | DGL | 12:11 | 12:24½ | |||
| Basingstoke Sig Be547 | 13:40 | 13:51 | ||||
| Wallers Ash Loop | 14:12 | 14:46 | ||||
| Eastleigh | 3 | 15:01½ | 15:05 | |||
| Southampton M.c.t. | 15:28 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.